BIL Integrated System LTD

logo remove bg

Surface Tubing Based Gaslift Instrumentation System Installation Services

BOP Integrity Projects – Ph1

BISL has installed over 18 surfaces tubing based gaslift system for low pressure wells on ExxonMobil offshore platdform production facilities. This system has helped inject gas from gas source well into low pressure oil wells for production optimization and has led to production recovery of over 300kbd of crude.

Leave a Comment

Your email address will not be published. Required fields are marked *